Malampaya Project

THE MALAMPAYA PROJECT The Malampaya project is a one of its kind project that the Philippines have developed. It is a big opportunity for the Philippines in gas development. The project aims to harvest Gas deep underwater and to use it as a source of power. It provides at least 40-45% of Luzon’s electricity since 2002. It is currently being conducted by Shell Philippines Exploration together with the joint partners Chevron Texaco Malampaya and PNOCEC. The gas was buried approximately 800 meters underwater deep in Northwest Palawan.
According to Department of Energy Philippines (2002) that Malaya Gas field is to produce 146 billion cubic feet (BCF) a year. It was proven that they have at least 80 million barrels of condensate and 20-40 million barrels of oil reserves which totals 2. 5 to 3. 5 trillion cubic feet of Gas (TCF). Last December 2012 there has been a plan to expand the Malampaya Gas plant. The Keppel Subic Shipyard started “striking steel” or steel cutting as a signal for their $1 billion fabrication of an offshore rig in expansion of the Malampaya project.
Keppel Subic will be a great help in developing the Malampaya project by building and installing substructure and topside modules in platforms to sustain its 2,700 megawatts production output and for the completion of the Malampaya 3. Also, it will generate at least 1,200 jobs according to Shell Philippines. It has been planned that in 2014, they will build additional two wells and in 2015, installing of new platform for additional equipment and facilities.

According to the consortium, the Malampaya 3 aims to keep a steady supply to maintain their commitments in ensuring the power supply for Luzon. It has been proven that they have 3. 2 trillion cubic feet reserves and 1 trillion of it has already been consumed. Sources: http://malampaya. com/? page_id=2 http://www. doe. gov. ph/DNG/malampaya_history. pdf http://www. gmanetwork. com/news/story/284493/economy/companies/keppel-subic-to-build-fabrication-yard-for-malampaya-deep-well-platform http://manilastandardtoday. com/2012/12/08/work-starts-on-expansionary-malampaya-rig/

Place your order
(550 words)

Approximate price: $22

Homework help cost calculator

600 words
We'll send you the complete homework by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 customer support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • 4 hour deadline
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 300 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
× How can I help you?