Level Operations

Level Operations, small company located in Pennsylvania, manufacturers a variety of security devices and safes. Several different models of safes (S7-S8-S9-S1-S2) are available for purchase and due to increased demand the production facility has been enlarged to accommodate the additional production needs. Production manager Stephanie Cole must determine the best production quantity per cycle for each day of the week. She understands that partially completed safes are not permitted (each cycle must turn out finished cycles). Stephanie consulted the engineering department; they have determined the best production sequence is S7-S8-S9-S1-S2.
Stephanie must comprehend the large picture of production demand in order to ensure the product availability to meet the needed demand. The ultimate goal should be a balanced operation system. One that makes the process time as short as possible, eradicate disruptions and eliminate waste (excess inventory)(Stevenson,2012). Stephanie was given weekly quantity demands; she must first break those numbers down to daily production demands, determine the number of cycles to run daily, and how many of each safe model to produce in any given cycles as shown in Figure 1. The cycle time should be set to equal the takt time.
Takt time is defined as “the cycle time needed to match customer demand for final products” (Stevenson, 2012). By only running three cycles per day, the company is producing fewer inventories. Additionally, the company is practicing lean production techniques by not allowing work-in-process inventory (reducing carry costs and space requirements) and lot sizes are small; yielding the similar benefits but also exhibiting better quality control and minimal inspection time if errors do arise. Stephanie has determined the best production quantity per cycle for each day of the week (Figure 2).

Figure 3 forecasts the quantity demanded versus the quantity supplied over the five week time frame. Model S8 and S9 are showing excessive inventories. However, by using a lean flexible production system Stephanie has the ability to decrease the units made during each cycle. By waiting to decrease the units per cycle till the later weeks in the production timeline; Stephanie is eliminating waste, and reducing the possibility of bottlenecks effects in the starting days of production. All other models are meeting their target numbers creating zero excessive inventories.

Place your order
(550 words)

Approximate price: $22

Homework help cost calculator

600 words
We'll send you the complete homework by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 customer support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • 4 hour deadline
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 300 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
× How can I help you?